NO. | CLIENT | PROJECT NAME | LOCATION | SCOPE OF WORK | DESCRIPTION | PROJECT DURATION | |
1 | PT Freeport Indonesia | Large Bore & SAG Building Pipe Fabrication | Gunanusa Yard, Grenyang | Supply and Fabrication | Large Bore & SAG Building Pipe Fabrication for Mill Optimization for UG Ores - Phase 1 | 04 April 22 - May 2023 | |
2 | PTTEP International Limited | EPCI of Wellhead Platforms, Associated Pipelines and Brownfield Modification for Zawtika Development Project Phase 1D | Gulf of Moattama, 300 km South of Yangon, Myanmar | EPCI | 01 Mar 21 - 28 Feb 23 | ||
3 | PT Saipem Indonesia | Fabrication of Piles, Sea fastening & Grillage for Jackets | Gunanusa Yard, Grenyang | Fabrication | Fabrication of Piles, Sea fastening & Grillage for Jackets of Qatar Gas NFPS Project | 25 Mar 22 - 31 Mar 23 | |
4 | PT. Synthetic Rubber Indonesia | 3rd Batch - Stripping Spool Replacement - Duplex Spool Replacement | Cilegon, Indonesia | Fabrication | Supply, Fabrication , Demolition & Installation Duplex Piping | April 21 - Dec 21 | |
5 | PGN SAKA | Provision of EPCIC Services for Sidayu Wellhead Platforms and Pipelines | Gresik, Jawa Timur | EPCIC | Provision of EPCIC Services for Sidayu Wellhead Platforms and Pipelines
|
Dec 19 - Dec 21 | |
6 | MITSUI Engineering & Shipbuilding Co., Ltd. | Fabrication of Cooling Water Pipe | Central Java, Indonesia | Fabrication | Pipe Fabrication, Pipe Erection & Installation of Cooling Water Pipe 4.2m x 3km in segments 39 m, 36 m, 10 m, 5 m with total weight 8,200 Ton. | Dec 19 - Dec 21 | |
7 | Konsorsium PT Seirama Laju & PT. Hafar Daya Konstruksi | Supply of Anchor Mooring Piles and PLEM Piiles | Gunanusa Yard, Cilegon | Fabrication | Supply Material and Fabrication of Belawan SPM Piles and PLEM Piles | Jan 21 - Apr 21 | |
8 | PT WASKITA KARYA(Persero) Tbk Infrastructure 2 Division | Fabrication of Jembatan Lintas Ahmad Yani (SB-Arch) | Becakayu Seksi 2A - Ujung, Jakarta, Indonesia | Fabrication | Tekla Modelling, Procurement, Fabrication and Erection of Bridge for Ahmad Yani (Span 53+100+60 m) and Hasibuan (80 m) of SBArch Girders | Jun 19 - Mar 21 | |
9 | PT WASKITA KARYA(Persero) Tbk Infrastructure 2 Division | Fabrication of Bridge Akses Arteri Hasibuan | Becakayu Seksi 2A - Ujung, Jakarta, Indonesia | Fabrication | Tekla Modelling, Procurement, Fabrication and Erection of Bridge for Ahmad Yani (Span 53+100+60 m) and Hasibuan (80 m) of SBArch Girders | Jun 19 - Mar 21 | |
10 | MITSUI Engineering & Shipbuilding Co., Ltd. | Fabrication of Additional Steel Pipe of Cooling Water Lines - Lot 3 and Modification of Steel Pipe | Central Java, Indonesia | Fabrication and Modification | Fabrication of Additional Steel Pipe of Cooling Water Lines
|
Aug 20 - Dec 20 | |
11 | Pertamina Hulu Energi ONWJ | Provision of Removal Platform YYA | Offshore North West Java | Procurement, Fabrication, Unloading and Inland Transportation of YYA Platform Component | Procurement, Fabrication, Unloading and Inland Transportation of YYA Platform | 2020 | |
12 | WASKITA ACSET - KSO | Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II(Elevated) | Grand Wisata, West Java, Indonesia | Fabrication & Installation | Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II (Elevated) | 2018-2019 | |
13 | BUKAKA | Fabrication of Steel I Girder Japek Sungai Cikarang | Cikarang, West Java, Indonesia | Fabrication | Fabrication of Steel I Girder Japek Sungai Cikarang | 2019 | |
14 | PT. Wijaya Karya Industri & Konstruksi | PT. Wijaya Karya Industri & Konstruksi Main Road Box | Toll Road Serpong - Kunciran and North Kalimantan | Fabrication | Fabrication of Bridge and Box Girder | 2018-2019 | |
15 | BLUEWATER | Manufacturing of 3 Units CALM BUOYS for PT. Pertamina (Persero), Indonesia | Semarang, Jakarta and Belawan | Procurement, Fabrication, Storage | Fabrication and Assembly, Pre-Commissioning and Testing, Load Out to Offshore, Offshore Commissioning | 2017-2018 | |
16 | ONGC - INDIA | Daman Development Project (Piles & Conductor) - India | Daman Sea - India | Fabrication | Fabrication and Supply of Piles and Conductors of Well Platforms for Daman Development Project | 2017-2018 | |
17 | PTTEP International Limited | EPCI OF WHP, Associated Pipeline & Tie-In For Zawtika Field Development Project Phase 1c (WHP & Pipelins & Tie In) | Gulf of Moattama, 300 km South of Yangon, Myanmar | Engineering, Procurement, Construction, Installation, Hook-up and Commissioning |
Lot 1: WP8 & WP9; Lot 2: WP 10 & WP11 - 4 x Wellhead Platforms: 6,450 MT - 4 x Jacket average : 6,560 MT - 4 sets piles @ 6500 tons, total 26,000 tons - Four (4) Associated Pipelines in total 67 KM, 18" and 16" - Two (2) Pipeline and Manifold (PLEM) - Brownfield Modification and Tie-in to Existing Platform - Water Depth = 142-156 meter CD |
2016-2018 | |
18 | PT Pertamina Hulu Energi -West Madura Offshore (PHE-WMO) | EPCI-1 SERVICE CONTRACT for: PHE- 12, PHE-24 and CPP2 Platforms and Pipeline. | West Madura Offshore - Indonesia | Engineering, Procurement, Construction, Installation, Hook-up & Commissioning |
- PHE-12 Deck : 465 MT, Jacket : 463 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve) - PHE-24 Deck : 330 MT, Jacket : 453 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve) - CPP2 Deck : 2500 MT, Jacket : 1200 MT, Piles : 1240 MT & Bridges : 50 MT, 4-legs with double better 1:10 |
2015-2017 | |
19 | Swiber / ONGC | ONGC - DAMAN DEVELOPMENT PROJECT | Adaman Sea Around 60 Km offshore-India | Fabrication 3 Jackets & 3 Topsides |
Fabrication of - Topsides and Jackets of C24-P3 Platform , - Topsides and Jackets of C24-P4 Platform, - Topsides and Jackets of C24-RP Platform, - Bridge from C24-RP to C24-P1 |
2015-2016 | |
20 | Petronas Carigali Ketapang II Ltd | BTJT-A TOPSIDE MODIFICATION, ADAPTOR FABRICATION AND PILE MAKE-UP FOR BUKIT TUA DEVELOPMENT PROJECT | 35 km north of Madura Island and 110 km northeast of Gresik |
- Topside Modification - Fabrication Pile Make Up - Fabrication Adapter |
2014 | ||
21 | Total Myanmar | Seismic Impact Project (SIP) | Adaman Sea, 60 Km Offshore nearest landfall Myanmar | Engineering, Procurement, Supply, Construction and Commissioning |
The existing facilities (PP, MCP, WP1, WP2, WP3 and connecting bridges PP-MCP, PP-WP1) |
2014 | |
22 | Total Myanmar TEPM - Myanmar |
Yadana Subsidence EPSCC1+EPSC2 | Adaman Sea, 60 Km Offshore nearest landfall Myanmar | EPSCC |
MSF of Platform - Topside : 1500 ton - Jacket : 1500 ton - Piles : 2600 ton - Topside : 320 ton - Jacket 450 ton |
2011-2014 | |
23 | Total Indonesie | Sisi Nubi 2B Peciko 7B | Sisi Nubi Field, Mahakam River Delta, East Kalimantan | EPCC |
Platform (topside weight, jacket, piles) WPS2 (1350,950,2680) four leg WPN3 (810,800,1800) tripod SWP-J (810,700,1700) tripod |
2012-2014 | |
24 | ONGC (INDIA) | ICP-R Process Platform and brownfield modification | Mumbai High (South) India | EPCIC (Gunanusa in joint venture with AFCONS (India)) | ICP-R Process Platform Topside (10,000 ton) consists of - MSF - 2900 MT - Building Module : 1500 MT - Separator Module : 1900 MT - Turbine Generator : 1700 MT - Process Gas Compression : 2000 MT |
2009-2011 | |
25 | HESS (Indonesia-Pangkah)- Indonesia | Central Processing Platform and Accomodation & Utility Platform | Solo River Delta, East Java | EPCC | CPP (total 3712 ton) : Deck 2008 ton Compression Module (including Flare Boom) 1705 ton Jacket 250 ton Pile 611 ton AUP : Deck 1902 ton Living Quarter 662 ton Jacket (including Boat landing) 312 ton Pile 568 ton Misc Bridge CPP-WHPA 130 ton, Bridge CPP-AUP 79 ton, Flare Boom 38 ton Brownfield Modification of WHP-A and WHP-B |
2008-2011 | |
26 | PTTEP, Thailand | Bongkot Field Development Project Phase 4A | Gulf of Thailand | EPCIC | Quarter Platform South, LQ for 160 workers, Topside 3400 ton 4 legged Jacket 750 ton Piles 950 ton Tripod Jacket Flare 650 ton 1000 tons Piles |
2008-2011 | |
27 | Total Indonesie | Peciko Field Development Phase 6 PCK.6 / EPSC.1 | Senipah, East Kalimantan | EPCI | Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. | 2007-2009 | |
28 | Total Indonesie | Tunu Field Dev Phase 11. TP.11.S / EPSC.1 - South Compression Platform. EPSC.2 - South Manifold Platform | Tunu Field East Kalimantan | EPCI | TP.11.S / EPSC.1 – South Compression Platform (SCP), Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 4600 MT Deck 14 leg Platforms | 2006-2009 | |
29 | TP.11.S / EPSC.2 –South Manifold Platform (SMP), Engineering, Procurement, Supply and Construction of 2 700 MT Deck, MP manifold with pig launcher and pig receiver, LP Manifold, 2 slug catchers, | ||||||
30 | Total Indonesie | SN 1 / EPSC 1 - PRODUCTION AND SEPARATION PLATFORM SNPS AND OFFSITES | Sisinubi - Delta Mahakam River East Kalimantan | EPCI | Sisi Nubi Production Separation Paltform (SNPS) 70 X 30 M • 12 Legs 48" Dia of SNPS Platform, Weight 2400 Tons • Finger Slug Catcher Separator 8 unit, Utilities and Piperack • Pig Receiver for the incaming 26" Pipelines • Instrument, Telecomm and Electrical uilding Associated offsite, tie in, ECB and existing TMP modification |
2004-2006 | |
31 | Saipem / BP Berau |
BP Tangguh GPF Project | PTG. Yard Grenyang | C | VR-A and VR-B Platform • 6 legged VR-A Jacket and Deck • 6 legged VR-B Jacket and Deck • Pile and Conductors 2,000 Tons |
2005-2006 | |
32 | Halliburton | Conoco FPSO Dev. Project | Batam | EPC | Workshop Building | 2002-2003 | |
33 | Halliburton | Conoco FPSO Dev. Project | Batam | EPC | LER's & PCB Building • 4 Units LER's (Local Equipment Rooms P4S4, P2S2) • 1 Unit PCB (Power Control Building) |
2002-2003 | |
34 | TOTALFINAELF E&P INDONESIE | Peciko Offshore Dev. Phase 4 PCK4/EPSC 2 | Kalimantan | EPCI | Two Satellite Welhead Platforms with Trunklines and Sealines Connected to Existing Platforms • 2 Jacket 4 Legs SWP E & K 800 Tons/ Ea • 2 Deck 4 Legs SWP E & K, 1700 Tons/Ea • 1 Temporary Drilling Deck • Offshore Hook-up & Modification of 4 Existing Platforms |
2002 | |
35 | TOTAL INDONESIE | Tunu North Field OWT Pltf TNOWT/EPSC 1 | Tunu, East Kalimantan | EPCI | Oily Water Treatment Platform 25 x 29 M • 4 Legs (OWT) Module Platform • Offsite Walkways 500 Mtr Long • Cold Vent Structure & System • Modification Existing NMP2,NCP,NCR Platforms |
2002-2003 | |
36 | UNOCAL IND. | ATTAKA "O" Platform and Subsea Pipelines | Kalimantan | EPCI | ATTAKA "O" Platform and Subsea Pipelines | 2001-2002 | |
37 | TOTAL INDONESIE | Peciko Field Dev. Phase 3 PCK3/EPSC 1 SWP-G and Sealines | Kalimantan | EPCI | Satellite Wellhead Platform & Pipeline. • 1 Ea 4 Legs Jacket • 1 Ea 4 Legs Dexk • Pipelines 20" Ø - 3600 Mtr |
2001-2002 | |
38 | TOTAL INDONESIE | Tunu North Field Proj. Ph. VIII North Compression Platform | Tunu, East Kalimantan | EPC | North Compression Platform (NCP) 80 x 30 M • 16 Leg NCP Deck, Weight 5400 Tons • 16 Leg Piles 3000 tons • Fab. & Insall (NCP) Including 48" Ø Pile Dreving |
2000-2002 | |
39 | MAXUS S.E.S | Vita's Jacket | Java Sea | EPC | Vita's Jacket, Piles and Miscellaneous Appurtenances | 2000 | |
40 | Merla Sakti / ARCO | LES ECHO | Java Sea | EPC | LES & ECHO Waterflood | 2000 | |
41 | PETROSEA IND. / TOTAL INDONESIE | Trunklines, TMP 2, STP GTS A Existing Module & 3 GTS's Modification TP 7 / EPSC 2 |
Tunu Field East Kalimantan | EPCI | Trunklines, TMP 2, STP 3 GTS's Modification | 1999-2001 | |
42 | TOTAL INDONESIE | Tunu Compression Platform and Offsites TP 7 / EPSC 1 | Tunu Field East Kalimantan | EPCI | Tunu Comprression Platform (TCP) and ASCF, Offsites and CPU 1 &2 Modifications 80X30 M • 16 Leg CPU Deck • 16 Leg Piles 48 " Ø • 4 Leg FWP Deck & Piles • 65 M Height Flare Stack • Offsite Facilities (Burn Pit etc.) |
1998-2000 | |
43 | Merla Sakti / ARCO | ESTA to ESA Pipelines | Java Sea | EPCI | ESTA to ESA Pipelines | 1998 | |
44 | Bouygues Offshore Elf Petroleum | Satellite West Platform and Central Platform | Maharaja Lela Jamalulam Field Brunei | EPCi | SWP and CP Platform • 4 legged CP Jacket & Pile • 4 legged SWP Jacket & Pile • 1 ea Temporary Drilling Deck • 1 ea Central Platform Deck • 1 ea Satellite West Platform Deck |
1997-1999 | |
45 | ARCO | YA JACKET, LNA CONDUCTOR & PILE | Java Sea | EPC | YA JACKET & MODIFICATION • YA Jacket • LNA Pile & Conductor • BJ Jacket Modification |
1996-1997 | |
46 | Total Indonesie | Tunu Field Development, EPSC 1 - NPU & Associated Offsites and Camp Facilities | Rerentang River, Tunu, East Kalimantan | EPCI | Northern Processing Unit (NPU) 70 X 30 M • 14 Legs NPU Platform, Weight 3600 Tons • 4 Legs Fire Water Platform, Weight 450 Tons • 2 ea HP Flare Tower & 50 M H and Camp • 1 Ea LP Flare Burn Pit • Camp and Heliped Facilities • Fab. & Install (NPU) Including 48" Ø Pile Driving |
1996-1998 | |
47 | Total Indonesie | Tambora Tunu Development Phase IV | River Tambora, East Kalimantan | EPCi | GTS J & Associated Wellhead • 4 Leg GTS Platform, 1 Unit • 4 Leg Pre-deven Pile • Offsite Facilities |
1996-1998 | |
48 | Merla Sakti / ARCO | LLD, LLE & LLF PLATFORMS | Java Sea | EPC | LLD, LLE, & LLF WELL PLATFORM • LLD Well Platform - Jacket (incl. Pile / B/L) • LLE & LLF Monopod Platform - Caison & Support - Deck - Pressure Vessel |
1996 | |
49 | Total Indonesie | Handil Enhanced Oil Recovery (EOR) | River, East Kalimantan | EPCI | Gas Compression • 4 Leg Comp. Deck - 1 Unit • 4 Leg Piles |
1994-1995 | |
50 | Total Indonesie | Tambora Tunu Development Phase 3 | River, East Kalimantan | EPC | Welded Plater Girder | 1992 | |
51 | MAXUS S.E.S | Indri & Kartini "A" | Java Sea | EPCI | Offshore Oil Production Facilities • 1 Offshore Jacket • Revamp. one Top side (Deck) • 12" Subsea Pipeline |
1992-1993 | |
52 | Total Indonesie | Tambora Tunu Development Phase 2 | Terentang River Tambora, East Kalimantan | EPCI | Gas Central Processing Unit (CPU) No. 2 • 14 Leg CPU Deck • 14 Leg Piles • 4 Leg FWS Deck & Piles • 45 M Height Flare Stack • Offsite Facilities (Burn Fit etc.) |
1992-1994 | |
53 | Total Indonesie | Tambora Tunu Development Phase 2 | River Tambora, East Kalimantan | EPCI | GTS B,C,D,E & Associated Wellhead • 4 Leg GTS Platform, 4 Unit • 4 Leg Pre-dirven Pile • Offsite Facilities |
1992-1994 | |
54 | ARBNI/Petrosea | Pagerungan Gas Development | Onshore Pagerungan Island | EPC | Gas Production facilities modules. • (13 Modules) |
1992-1993 | |
55 | Total Indonesie | Tambora Tunu Development Phase 2 | River, East Kalimantan | EPC | Welded Plater Girder | 1991-1992 | |
56 | Total Indonesie | Tambora Tunu Development Phase 2 Tunu 2/C/210 |
River, East Kalimantan | EPC | Welded Plater Girder, Fabrication Steel Element & Deck Plating for GTS & Wellhead Platform | 1992-1993 | |
57 | MAXUS S.E.S | North Intan "A" | Java Sea | EPCI | Offshore Oil Production Facilities • 1 Offshore Jacket • Revamp. one Top side (Deck) • 12" Subsea Pipeline • Subsea Cable |
1990 | |
58 | Total Indonesie | Handil Gaslift | River East Kalimantan | EPCI | Gas Compression (Handil Gaslift & Associated Offsite) • 4 Leg Module Gaslift Deck • 4 Leg Piles • 3 Fender Piles • Offsite Facilities |
1990-1993 | |
59 | MAXUS S.E.S | South Zelda "A" | Java Sea | ECI | Offshore Oil Production Facilities • 1 Offshore Jacket • Revamp. one Top side • 12" Subsea Pipeline • Subsea Cable |
1990 | |
60 | Atlantic Richfield Indonesia | BZZA | Java Sea | EPCI | Offshore Oil Production Facilities • One Topside (deck) facilities • Subsea Pipeline • (12" dia, 16" dia, 20" dia) |
1989-1990 | |
61 | Total Indonesie | Tambora Tunu Development Phase 1 | Terentang River Tambora, East Kalimantan | EPCI | Gas Central Processing Unit (CPU) No. 1 • 16 Leg CPU Deck • 16 Leg Piles • 4 Leg FWS Deck & Piles • 65 M Height Flare Stack • Offsite Facilities (Burn Pit etc.) |
1988-1990 | |
62 | Kodeco Oil Ltd. | KE-5 Field Development | Java Sea | EPCI | Offshore Gas Production Facilities • 1 Topside CPP Facility • 2 Offshore Jacket • 1 Living Quarter • 14" dia Pipeline • ORF at Gresik |
1988 | |
63 | Hudbay Oil | Kurau Field Development | Onshore P. Panjang | EPCI | Block Station Oil Production & Processing Facilities | 1988-1990 | |
64 | Amoseas Indonesia | Anoa Field Development | Natuna Sea Block D | EP | Offshore Oil Production Facilities • One Topside fac • One Offshore Jacket • One Living Quarter • Subsea pipeline. |
1988-1990 | |
65 | Atlantic Richfield Indonesia | ZULU A/B/C/D/ & AAB | Java Sea | EPC | Offshore Oil Production Facilities • Five Topside (deck) facilities. |
1986-1987 | |
66 | Kodeco Oil Ltd. | KE-2 Field Development | Java Sea | EPCI | Offshore Oil Production Facilities • Four Topside Facilities • Four Offshore Jacket • One Sat Proc. • One Flare Tripod • Subsea pipeline |
1985-1986 | |
67 | Atlantic Richfield Indonesia | " M " Field Development | Java Sea | EPCI | Offshore Oil Production Facilities • 1 Tripod Deck • 1 Tripod Jacket • 1 Caisson & Pile |
1985-1986 | |
68 | Atlantic Richfield Indonesia | "LD" Development | Java Sea | EPCI | Offshore Oil Production Facilities • 1 Topside Production Facility • 1 Offshore Jacket • Pipelines |
1984-1985 | |
69 | Atlantic Richfield Indonesia | PB, PD, PF | Java Sea | EPCI | Offshore Oil Production Facilities • Three Topside (Deck) facilities |
1983-1984 | |
70 | IIAPCO/MAXUS | Cinta Natomas Dev. (Platform 47 & 48) | Java Sea | EPC | Offshore Oil Production Facilities • 2 Topside (Deck) Prod. Facility |
1983-1984 |