NO. CLIENT PROJECT NAME LOCATION SCOPE OF WORK DESCRIPTION PROJECT DURATION  
1 PT Freeport Indonesia Large Bore & SAG Building Pipe Fabrication Gunanusa Yard, Grenyang Supply and Fabrication Large Bore & SAG Building Pipe Fabrication for Mill Optimization for UG Ores - Phase 1 04 April 22 - May 2023
2 PTTEP International Limited EPCI of Wellhead Platforms, Associated Pipelines and Brownfield Modification for Zawtika Development Project Phase 1D Gulf of Moattama, 300 km South of Yangon, Myanmar EPCI 01 Mar 21 - 28 Feb 23
3 PT Saipem Indonesia Fabrication of Piles, Sea fastening & Grillage for Jackets Gunanusa Yard, Grenyang Fabrication Fabrication of Piles, Sea fastening & Grillage for Jackets of Qatar Gas NFPS Project 25 Mar 22 - 31 Mar 23
4 PT. Synthetic Rubber Indonesia 3rd Batch - Stripping Spool Replacement - Duplex Spool Replacement Cilegon, Indonesia Fabrication Supply, Fabrication , Demolition & Installation Duplex Piping April 21 - Dec 21
5 PGN SAKA Provision of EPCIC Services for Sidayu Wellhead Platforms and Pipelines Gresik, Jawa Timur EPCIC Provision of EPCIC Services for Sidayu Wellhead Platforms and Pipelines
  • 2 x Offshore Wellhead Platforms (WHP-C and WHP-D)
  • WHP-C; 336 MT Jacket & 471 MT Topside
  • WHP-D; 217 MT Jacket & 485 MT Topside
  • Two (2) Associated Pipelines 6" & 12" FOR 2.5 km
  • Modification
Dec 19 - Dec 21
6 MITSUI Engineering & Shipbuilding Co., Ltd. Fabrication of Cooling Water Pipe Central Java, Indonesia Fabrication Pipe Fabrication, Pipe Erection & Installation of Cooling Water Pipe 4.2m x 3km in segments 39 m, 36 m, 10 m, 5 m with total weight 8,200 Ton. Dec 19 - Dec 21
7 Konsorsium PT Seirama Laju & PT. Hafar Daya Konstruksi Supply of Anchor Mooring Piles and PLEM Piiles Gunanusa Yard, Cilegon Fabrication Supply Material and Fabrication of Belawan SPM Piles and PLEM Piles Jan 21 - Apr 21
8 PT WASKITA KARYA(Persero) Tbk Infrastructure 2 Division Fabrication of Jembatan Lintas Ahmad Yani (SB-Arch) Becakayu Seksi 2A - Ujung, Jakarta, Indonesia Fabrication Tekla Modelling, Procurement, Fabrication and Erection of Bridge for Ahmad Yani (Span 53+100+60 m) and Hasibuan (80 m) of SBArch Girders Jun 19 - Mar 21
9 PT WASKITA KARYA(Persero) Tbk Infrastructure 2 Division Fabrication of Bridge Akses Arteri Hasibuan Becakayu Seksi 2A - Ujung, Jakarta, Indonesia Fabrication Tekla Modelling, Procurement, Fabrication and Erection of Bridge for Ahmad Yani (Span 53+100+60 m) and Hasibuan (80 m) of SBArch Girders Jun 19 - Mar 21
10 MITSUI Engineering & Shipbuilding Co., Ltd. Fabrication of Additional Steel Pipe of Cooling Water Lines - Lot 3 and Modification of Steel Pipe Central Java, Indonesia Fabrication and Modification Fabrication of Additional Steel Pipe of Cooling Water Lines
  • Lot 3 and Modification of Steel Pipe
Aug 20 - Dec 20
11 Pertamina Hulu Energi ONWJ Provision of Removal Platform YYA Offshore North West Java Procurement, Fabrication, Unloading and Inland Transportation of YYA Platform Component Procurement, Fabrication, Unloading and Inland Transportation of YYA Platform 2020
12 WASKITA ACSET - KSO Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II(Elevated) Grand Wisata, West Java, Indonesia Fabrication & Installation Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II (Elevated) 2018-2019
13 BUKAKA Fabrication of Steel I Girder Japek Sungai Cikarang Cikarang, West Java, Indonesia Fabrication Fabrication of Steel I Girder Japek Sungai Cikarang 2019
14 PT. Wijaya Karya Industri & Konstruksi PT. Wijaya Karya Industri & Konstruksi Main Road Box Toll Road Serpong - Kunciran and North Kalimantan Fabrication Fabrication of Bridge and Box Girder 2018-2019
15 BLUEWATER Manufacturing of 3 Units CALM BUOYS for PT. Pertamina (Persero), Indonesia Semarang, Jakarta and Belawan Procurement, Fabrication, Storage Fabrication and Assembly, Pre-Commissioning and Testing, Load Out to Offshore, Offshore Commissioning 2017-2018
16 ONGC - INDIA Daman Development Project (Piles & Conductor) - India Daman Sea - India Fabrication Fabrication and Supply of Piles and Conductors of Well Platforms for Daman Development Project 2017-2018
17 PTTEP International Limited EPCI OF WHP, Associated Pipeline & Tie-In For Zawtika Field Development Project Phase 1c (WHP & Pipelins & Tie In) Gulf of Moattama, 300 km South of Yangon, Myanmar Engineering, Procurement, Construction, Installation, Hook-up and Commissioning Lot 1: WP8 & WP9; Lot 2: WP 10 & WP11
- 4 x Wellhead Platforms: 6,450 MT
- 4 x Jacket average : 6,560 MT
- 4 sets piles @ 6500 tons, total 26,000 tons
- Four (4) Associated Pipelines in total 67 KM, 18" and 16"
- Two (2) Pipeline and Manifold (PLEM)
- Brownfield Modification and Tie-in to Existing Platform
- Water Depth = 142-156 meter CD
2016-2018
18 PT Pertamina Hulu Energi -West Madura Offshore (PHE-WMO) EPCI-1 SERVICE CONTRACT for: PHE- 12, PHE-24 and CPP2 Platforms and Pipeline. West Madura Offshore - Indonesia Engineering, Procurement, Construction, Installation, Hook-up & Commissioning - PHE-12 Deck : 465 MT, Jacket : 463 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve)
- PHE-24 Deck : 330 MT, Jacket : 453 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve)
- CPP2 Deck : 2500 MT, Jacket : 1200 MT, Piles : 1240 MT & Bridges : 50 MT, 4-legs with double better 1:10
2015-2017
19 Swiber / ONGC ONGC - DAMAN DEVELOPMENT PROJECT Adaman Sea Around 60 Km offshore-India Fabrication 3 Jackets & 3 Topsides Fabrication of
- Topsides and Jackets of C24-P3 Platform ,
- Topsides and Jackets of C24-P4 Platform,
- Topsides and Jackets of C24-RP Platform,
- Bridge from C24-RP to C24-P1
2015-2016
20 Petronas Carigali Ketapang II Ltd BTJT-A TOPSIDE MODIFICATION, ADAPTOR FABRICATION AND PILE MAKE-UP FOR BUKIT TUA DEVELOPMENT PROJECT 35 km north of Madura Island and 110 km northeast of Gresik
- Topside Modification
- Fabrication Pile Make Up
- Fabrication Adapter
2014
21 Total Myanmar Seismic Impact Project (SIP) Adaman Sea, 60 Km Offshore nearest landfall Myanmar Engineering, Procurement, Supply, Construction and Commissioning The existing facilities (PP, MCP, WP1, WP2, WP3 and connecting bridges PP-MCP, PP-WP1)
2014
22 Total Myanmar
TEPM - Myanmar
Yadana Subsidence EPSCC1+EPSC2 Adaman Sea, 60 Km Offshore nearest landfall Myanmar EPSCC MSF of Platform
- Topside : 1500 ton
- Jacket : 1500 ton
- Piles : 2600 ton
- Topside : 320 ton
- Jacket 450 ton
2011-2014
23 Total Indonesie Sisi Nubi 2B Peciko 7B Sisi Nubi Field, Mahakam River Delta, East Kalimantan EPCC Platform (topside weight, jacket, piles)
WPS2 (1350,950,2680) four leg
WPN3 (810,800,1800) tripod
SWP-J (810,700,1700) tripod
2012-2014
24 ONGC (INDIA) ICP-R Process Platform and brownfield modification Mumbai High (South) India EPCIC (Gunanusa in joint venture with AFCONS (India)) ICP-R Process Platform
Topside (10,000 ton) consists of

-
MSF - 2900 MT
- Building Module : 1500 MT
- Separator Module : 1900 MT
- Turbine Generator : 1700 MT
- Process Gas Compression : 2000 MT
2009-2011
25 HESS (Indonesia-Pangkah)- Indonesia Central Processing Platform and Accomodation & Utility Platform Solo River Delta, East Java EPCC CPP (total 3712 ton) :
Deck 2008 ton
Compression Module (including Flare Boom) 1705 ton
Jacket 250 ton
Pile 611 ton
AUP :
Deck 1902 ton
Living Quarter 662 ton
Jacket (including Boat landing) 312 ton
Pile 568 ton
Misc
Bridge CPP-WHPA 130 ton, Bridge CPP-AUP 79 ton, Flare Boom 38 ton
Brownfield Modification of WHP-A and WHP-B
2008-2011
26 PTTEP, Thailand Bongkot Field Development Project Phase 4A Gulf of Thailand EPCIC Quarter Platform South, LQ for 160 workers,
Topside 3400 ton
4 legged Jacket 750 ton
Piles 950 ton
Tripod Jacket Flare 650 ton
1000 tons Piles
2008-2011
27 Total Indonesie Peciko Field Development Phase 6 PCK.6 / EPSC.1 Senipah, East Kalimantan EPCI Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 2007-2009
28 Total Indonesie Tunu Field Dev Phase 11. TP.11.S / EPSC.1 - South Compression Platform. EPSC.2 - South Manifold Platform Tunu Field East Kalimantan EPCI TP.11.S / EPSC.1 – South Compression Platform (SCP), Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 4600 MT Deck 14 leg Platforms 2006-2009
29 TP.11.S / EPSC.2 –South Manifold Platform (SMP), Engineering, Procurement, Supply and Construction of 2 700 MT Deck, MP manifold with pig launcher and pig receiver, LP Manifold, 2 slug catchers,  
30 Total Indonesie SN 1 / EPSC 1 - PRODUCTION AND SEPARATION PLATFORM SNPS AND OFFSITES Sisinubi - Delta Mahakam River East Kalimantan EPCI Sisi Nubi Production Separation Paltform (SNPS)
70 X 30 M
• 12 Legs 48" Dia of SNPS Platform, Weight 2400 Tons
• Finger Slug Catcher Separator 8 unit, Utilities and Piperack
• Pig Receiver for the incaming 26" Pipelines
• Instrument, Telecomm and Electrical uilding
Associated offsite, tie in, ECB and existing TMP modification
2004-2006
31 Saipem /
BP Berau
BP Tangguh GPF Project PTG. Yard Grenyang C VR-A and VR-B Platform
• 6 legged VR-A Jacket and Deck
• 6 legged VR-B Jacket and Deck
• Pile and Conductors 2,000 Tons
2005-2006
32 Halliburton Conoco FPSO Dev. Project Batam EPC Workshop Building 2002-2003
33 Halliburton Conoco FPSO Dev. Project Batam EPC LER's & PCB Building
• 4 Units LER's (Local Equipment Rooms P4S4, P2S2)
• 1 Unit PCB (Power Control Building)
2002-2003  
34 TOTALFINAELF E&P INDONESIE Peciko Offshore Dev. Phase 4 PCK4/EPSC 2 Kalimantan EPCI Two Satellite Welhead Platforms with Trunklines and Sealines Connected to Existing Platforms
• 2 Jacket 4 Legs SWP E & K 800 Tons/ Ea
• 2 Deck 4 Legs SWP E & K, 1700 Tons/Ea
• 1 Temporary Drilling Deck
• Offshore Hook-up & Modification of 4 Existing Platforms
2002
35 TOTAL INDONESIE Tunu North Field OWT Pltf TNOWT/EPSC 1 Tunu, East Kalimantan EPCI Oily Water Treatment Platform 25 x 29 M
• 4 Legs (OWT) Module Platform
• Offsite Walkways 500 Mtr Long
• Cold Vent Structure & System
• Modification Existing NMP2,NCP,NCR Platforms
2002-2003
36 UNOCAL IND. ATTAKA "O" Platform and Subsea Pipelines Kalimantan EPCI ATTAKA "O" Platform and Subsea Pipelines 2001-2002
37 TOTAL INDONESIE Peciko Field Dev. Phase 3 PCK3/EPSC 1 SWP-G and Sealines Kalimantan EPCI Satellite Wellhead Platform & Pipeline.
• 1 Ea 4 Legs Jacket
• 1 Ea 4 Legs Dexk
• Pipelines 20" Ø - 3600 Mtr
2001-2002
38 TOTAL INDONESIE Tunu North Field Proj. Ph. VIII North Compression Platform Tunu, East Kalimantan EPC North Compression Platform (NCP) 80 x 30 M
• 16 Leg NCP Deck, Weight 5400 Tons
• 16 Leg Piles 3000 tons
• Fab. & Insall (NCP) Including 48" Ø Pile Dreving
2000-2002
39 MAXUS S.E.S Vita's Jacket Java Sea EPC Vita's Jacket, Piles and Miscellaneous Appurtenances 2000  
40 Merla Sakti / ARCO LES ECHO Java Sea EPC LES & ECHO Waterflood 2000  
41 PETROSEA IND. / TOTAL INDONESIE Trunklines, TMP 2, STP GTS A Existing Module & 3 GTS's Modification
TP 7 / EPSC 2
Tunu Field East Kalimantan EPCI Trunklines, TMP 2, STP 3 GTS's Modification 1999-2001  
42 TOTAL INDONESIE Tunu Compression Platform and Offsites TP 7 / EPSC 1 Tunu Field East Kalimantan EPCI Tunu Comprression Platform (TCP) and ASCF, Offsites and CPU 1 &2 Modifications 80X30 M
• 16 Leg CPU Deck
• 16 Leg Piles 48 " Ø
• 4 Leg FWP Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1998-2000
43 Merla Sakti / ARCO ESTA to ESA Pipelines Java Sea EPCI ESTA to ESA Pipelines 1998  
44 Bouygues Offshore Elf Petroleum Satellite West Platform and Central Platform Maharaja Lela Jamalulam Field Brunei EPCi SWP and CP Platform
• 4 legged CP Jacket & Pile
• 4 legged SWP Jacket & Pile
• 1 ea Temporary Drilling Deck
• 1 ea Central Platform Deck
• 1 ea Satellite West Platform Deck
1997-1999
45 ARCO YA JACKET, LNA CONDUCTOR & PILE Java Sea EPC YA JACKET & MODIFICATION
• YA Jacket
• LNA Pile & Conductor
• BJ Jacket Modification
1996-1997  
46 Total Indonesie Tunu Field Development, EPSC 1 - NPU & Associated Offsites and Camp Facilities Rerentang River, Tunu, East Kalimantan EPCI Northern Processing Unit (NPU) 70 X 30 M
• 14 Legs NPU Platform, Weight 3600 Tons
• 4 Legs Fire Water Platform, Weight 450 Tons
• 2 ea HP Flare Tower & 50 M H and Camp
• 1 Ea LP Flare Burn Pit
• Camp and Heliped Facilities
• Fab. & Install (NPU) Including 48" Ø Pile Driving
1996-1998
47 Total Indonesie Tambora Tunu Development Phase IV River Tambora, East Kalimantan EPCi GTS J & Associated Wellhead
• 4 Leg GTS Platform, 1 Unit
• 4 Leg Pre-deven Pile
• Offsite Facilities
1996-1998  
48 Merla Sakti / ARCO LLD, LLE & LLF PLATFORMS Java Sea EPC LLD, LLE, & LLF WELL PLATFORM
• LLD Well Platform
- Jacket (incl. Pile / B/L)
• LLE & LLF Monopod Platform
- Caison & Support
- Deck
- Pressure Vessel
1996  
49 Total Indonesie Handil Enhanced Oil Recovery (EOR) River, East Kalimantan EPCI Gas Compression
• 4 Leg Comp. Deck - 1 Unit
• 4 Leg Piles
1994-1995  
50 Total Indonesie Tambora Tunu Development Phase 3 River, East Kalimantan EPC Welded Plater Girder 1992  
51 MAXUS S.E.S Indri & Kartini "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
1992-1993  
52 Total Indonesie Tambora Tunu Development Phase 2 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 2
• 14 Leg CPU Deck
• 14 Leg Piles
• 4 Leg FWS Deck & Piles
• 45 M Height Flare Stack
• Offsite Facilities (Burn Fit etc.)
1992-1994
53 Total Indonesie Tambora Tunu Development Phase 2 River Tambora, East Kalimantan EPCI GTS B,C,D,E & Associated Wellhead
• 4 Leg GTS Platform, 4 Unit
• 4 Leg Pre-dirven Pile
• Offsite Facilities
1992-1994  
54 ARBNI/Petrosea Pagerungan Gas Development Onshore Pagerungan Island EPC Gas Production facilities modules.
• (13 Modules)
1992-1993  
55 Total Indonesie Tambora Tunu Development Phase 2 River, East Kalimantan EPC Welded Plater Girder 1991-1992  
56 Total Indonesie Tambora Tunu Development Phase 2
Tunu 2/C/210
River, East Kalimantan EPC Welded Plater Girder, Fabrication Steel Element & Deck Plating for GTS & Wellhead Platform 1992-1993  
57 MAXUS S.E.S North Intan "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
• Subsea Cable
1990  
58 Total Indonesie Handil Gaslift River East Kalimantan EPCI Gas Compression (Handil Gaslift & Associated Offsite)
• 4 Leg Module Gaslift Deck
• 4 Leg Piles
• 3 Fender Piles
• Offsite Facilities
1990-1993  
59 MAXUS S.E.S South Zelda "A" Java Sea ECI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side
• 12" Subsea Pipeline
• Subsea Cable
1990  
60 Atlantic Richfield Indonesia BZZA Java Sea EPCI Offshore Oil Production Facilities
• One Topside (deck) facilities
• Subsea Pipeline
• (12" dia, 16" dia, 20" dia)
1989-1990  
61 Total Indonesie Tambora Tunu Development Phase 1 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 1
• 16 Leg CPU Deck
• 16 Leg Piles
• 4 Leg FWS Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1988-1990  
62 Kodeco Oil Ltd. KE-5 Field Development Java Sea EPCI Offshore Gas Production Facilities
• 1 Topside CPP Facility
• 2 Offshore Jacket
• 1 Living Quarter
• 14" dia Pipeline
• ORF at Gresik
1988  
63 Hudbay Oil Kurau Field Development Onshore P. Panjang EPCI Block Station Oil Production & Processing Facilities 1988-1990  
64 Amoseas Indonesia Anoa Field Development Natuna Sea Block D EP Offshore Oil Production Facilities
• One Topside fac
• One Offshore Jacket
• One Living Quarter
• Subsea pipeline.
1988-1990  
65 Atlantic Richfield Indonesia ZULU A/B/C/D/ & AAB Java Sea EPC Offshore Oil Production Facilities
• Five Topside (deck) facilities.
1986-1987  
66 Kodeco Oil Ltd. KE-2 Field Development Java Sea EPCI Offshore Oil Production Facilities
• Four Topside Facilities
• Four Offshore Jacket
• One Sat Proc.
• One Flare Tripod
• Subsea pipeline
1985-1986  
67 Atlantic Richfield Indonesia " M " Field Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Tripod Deck
• 1 Tripod Jacket
• 1 Caisson & Pile
1985-1986  
68 Atlantic Richfield Indonesia "LD" Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Topside Production Facility
• 1 Offshore Jacket
• Pipelines
1984-1985  
69 Atlantic Richfield Indonesia PB, PD, PF Java Sea EPCI Offshore Oil Production Facilities
• Three Topside (Deck) facilities
1983-1984  
70 IIAPCO/MAXUS Cinta Natomas Dev. (Platform 47 & 48) Java Sea EPC Offshore Oil Production Facilities
• 2 Topside (Deck) Prod. Facility
1983-1984