NO. CLIENT PROJECT NAME LOCATION SCOPE OF WORK DESCRIPTION PROJECT DURATION  
1 WASKITA ACSET - KSO Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II(Elevated) Grand Wisata, West Java, Indonesia Fabrication & Installation Fabrication of Steel Box Girder Toll Road Jakarta - Cikampek II (Elevated) 2018-2019
2 BUKAKA Fabrication of Steel I Girder Japek Sungai Cikarang Cikarang, West Java, Indonesia Fabrication Fabrication of Steel I Girder Japek Sungai Cikarang 2019
3 PT. Wijaya Karya Industri & Konstruksi PT. Wijaya Karya Industri & Konstruksi Main Road Box Toll Road Serpong - Kunciran and North Kalimantan Fabrication Fabrication of Bridge and Box Girder 2018-2019
4 BLUEWATER Manufacturing of 3 Units CALM BUOYS for PT. Pertamina (Persero), Indonesia Semarang, Jakarta and Belawan Procurement, Fabrication, Storage Fabrication and Assembly, Pre-Commissioning and Testing, Load Out to Offshore, Offshore Commissioning 2017-2018
5 ONGC - INDIA Daman Development Project (Piles & Conductor) - India Daman Sea - India Fabrication Fabrication and Supply of Piles and Conductors of Well Platforms for Daman Development Project 2017-2018
6 PTTEP International Limited EPCI OF WHP, Associated Pipeline & Tie-In For Zawtika Field Development Project Phase 1c (WHP & Pipelins & Tie In) Gulf of Moattama, 300 km South of Yangon, Myanmar Engineering, Procurement, Construction, Installation, Hook-up and Commissioning Lot 1: WP8 & WP9; Lot 2: WP 10 & WP11
- 4 x Wellhead Platforms: 6,450 MT
- 4 x Jacket average : 6,560 MT
- 4 sets piles @ 6500 tons, total 26,000 tons
- Four (4) Associated Pipelines in total 67 KM, 18" and 16"
- Two (2) Pipeline and Manifold (PLEM)
- Brownfield Modification and Tie-in to Existing Platform
- Water Depth = 142-156 meter CD
2016-2018
7 PT Pertamina Hulu Energi -West Madura Offshore (PHE-WMO) EPCI-1 SERVICE CONTRACT for: PHE- 12, PHE-24 and CPP2 Platforms and Pipeline. West Madura Offshore - Indonesia Engineering, Procurement, Construction, Installation, Hook-up & Commissioning - PHE-12 Deck : 465 MT, Jacket : 463 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve)
- PHE-24 Deck : 330 MT, Jacket : 453 MT, Piles : 264 MT, Braced Monopod, 3 legs (2 battered sleeve & 1 caisson sleeve)
- CPP2 Deck : 2500 MT, Jacket : 1200 MT, Piles : 1240 MT & Bridges : 50 MT, 4-legs with double better 1:10
2015-2017
8 Swiber / ONGC ONGC - DAMAN DEVELOPMENT PROJECT Adaman Sea Around 60 Km offshore-India Fabrication 3 Jackets & 3 Topsides Fabrication of
- Topsides and Jackets of C24-P3 Platform ,
- Topsides and Jackets of C24-P4 Platform,
- Topsides and Jackets of C24-RP Platform,
- Bridge from C24-RP to C24-P1
2015-2016
9 Petronas Carigali Ketapang II Ltd BTJT-A TOPSIDE MODIFICATION, ADAPTOR FABRICATION AND PILE MAKE-UP FOR BUKIT TUA DEVELOPMENT PROJECT 35 km north of Madura Island and 110 km northeast of Gresik
- Topside Modification
- Fabrication Pile Make Up
- Fabrication Adapter
2014
10 Total Myanmar Seismic Impact Project (SIP) Adaman Sea, 60 Km Offshore nearest landfall Myanmar Engineering, Procurement, Supply, Construction and Commissioning The existing facilities (PP, MCP, WP1, WP2, WP3 and connecting bridges PP-MCP, PP-WP1)
2014
11 Total Myanmar
TEPM - Myanmar
Yadana Subsidence EPSCC1+EPSC2 Adaman Sea, 60 Km Offshore nearest landfall Myanmar EPSCC MSF of Platform
- Topside : 1500 ton
- Jacket : 1500 ton
- Piles : 2600 ton
- Topside : 320 ton
- Jacket 450 ton
2011-2014
12 Total Indonesie Sisi Nubi 2B Peciko 7B Sisi Nubi Field, Mahakam River Delta, East Kalimantan EPCC Platform (topside weight, jacket, piles)
WPS2 (1350,950,2680) four leg
WPN3 (810,800,1800) tripod
SWP-J (810,700,1700) tripod
2012-2014
13 ONGC (INDIA) ICP-R Process Platform and brownfield modification Mumbai High (South) India EPCIC (Gunanusa in joint venture with AFCONS (India)) ICP-R Process Platform
Topside (10,000 ton) consists of

-
MSF - 2900 MT
- Building Module : 1500 MT
- Separator Module : 1900 MT
- Turbine Generator : 1700 MT
- Process Gas Compression : 2000 MT
2009-2011
14 HESS (Indonesia-Pangkah)- Indonesia Central Processing Platform and Accomodation & Utility Platform Solo River Delta, East Java EPCC CPP (total 3712 ton) :
Deck 2008 ton
Compression Module (including Flare Boom) 1705 ton
Jacket 250 ton
Pile 611 ton
AUP :
Deck 1902 ton
Living Quarter 662 ton
Jacket (including Boat landing) 312 ton
Pile 568 ton
Misc
Bridge CPP-WHPA 130 ton, Bridge CPP-AUP 79 ton, Flare Boom 38 ton
Brownfield Modification of WHP-A and WHP-B
2008-2011
15 PTTEP, Thailand Bongkot Field Development Project Phase 4A Gulf of Thailand EPCIC Quarter Platform South, LQ for 160 workers,
Topside 3400 ton
4 legged Jacket 750 ton
Piles 950 ton
Tripod Jacket Flare 650 ton
1000 tons Piles
2008-2011
16 Total Indonesie Peciko Field Development Phase 6 PCK.6 / EPSC.1 Senipah, East Kalimantan EPCI Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 2007-2009
17 Total Indonesie Tunu Field Dev Phase 11. TP.11.S / EPSC.1 - South Compression Platform. EPSC.2 - South Manifold Platform Tunu Field East Kalimantan EPCI TP.11.S / EPSC.1 – South Compression Platform (SCP), Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 4600 MT Deck 14 leg Platforms 2006-2009
18 TP.11.S / EPSC.2 –South Manifold Platform (SMP), Engineering, Procurement, Supply and Construction of 2 700 MT Deck, MP manifold with pig launcher and pig receiver, LP Manifold, 2 slug catchers,  
19 Total Indonesie SN 1 / EPSC 1 - PRODUCTION AND SEPARATION PLATFORM SNPS AND OFFSITES Sisinubi - Delta Mahakam River East Kalimantan EPCI Sisi Nubi Production Separation Paltform (SNPS)
70 X 30 M
• 12 Legs 48" Dia of SNPS Platform, Weight 2400 Tons
• Finger Slug Catcher Separator 8 unit, Utilities and Piperack
• Pig Receiver for the incaming 26" Pipelines
• Instrument, Telecomm and Electrical uilding
Associated offsite, tie in, ECB and existing TMP modification
2004-2006
20 Saipem /
BP Berau
BP Tangguh GPF Project PTG. Yard Grenyang C VR-A and VR-B Platform
• 6 legged VR-A Jacket and Deck
• 6 legged VR-B Jacket and Deck
• Pile and Conductors 2,000 Tons
2005-2006
21 Halliburton Conoco FPSO Dev. Project Batam EPC Workshop Building 2002-2003
22 Halliburton Conoco FPSO Dev. Project Batam EPC LER's & PCB Building
• 4 Units LER's (Local Equipment Rooms P4S4, P2S2)
• 1 Unit PCB (Power Control Building)
2002-2003  
23 TOTALFINAELF E&P INDONESIE Peciko Offshore Dev. Phase 4 PCK4/EPSC 2 Kalimantan EPCI Two Satellite Welhead Platforms with Trunklines and Sealines Connected to Existing Platforms
• 2 Jacket 4 Legs SWP E & K 800 Tons/ Ea
• 2 Deck 4 Legs SWP E & K, 1700 Tons/Ea
• 1 Temporary Drilling Deck
• Offshore Hook-up & Modification of 4 Existing Platforms
2002
24 TOTAL INDONESIE Tunu North Field OWT Pltf TNOWT/EPSC 1 Tunu, East Kalimantan EPCI Oily Water Treatment Platform 25 x 29 M
• 4 Legs (OWT) Module Platform
• Offsite Walkways 500 Mtr Long
• Cold Vent Structure & System
• Modification Existing NMP2,NCP,NCR Platforms
2002-2003
25 UNOCAL IND. ATTAKA "O" Platform and Subsea Pipelines Kalimantan EPCI ATTAKA "O" Platform and Subsea Pipelines 2001-2002
26 TOTAL INDONESIE Peciko Field Dev. Phase 3 PCK3/EPSC 1 SWP-G and Sealines Kalimantan EPCI Satellite Wellhead Platform & Pipeline.
• 1 Ea 4 Legs Jacket
• 1 Ea 4 Legs Dexk
• Pipelines 20" Ø - 3600 Mtr
2001-2002
27 TOTAL INDONESIE Tunu North Field Proj. Ph. VIII North Compression Platform Tunu, East Kalimantan EPC North Compression Platform (NCP) 80 x 30 M
• 16 Leg NCP Deck, Weight 5400 Tons
• 16 Leg Piles 3000 tons
• Fab. & Insall (NCP) Including 48" Ø Pile Dreving
2000-2002
28 MAXUS S.E.S Vita's Jacket Java Sea EPC Vita's Jacket, Piles and Miscellaneous Appurtenances 2000  
29 Merla Sakti / ARCO LES ECHO Java Sea EPC LES & ECHO Waterflood 2000  
30 PETROSEA IND. / TOTAL INDONESIE Trunklines, TMP 2, STP GTS A Existing Module & 3 GTS's Modification
TP 7 / EPSC 2
Tunu Field East Kalimantan EPCI Trunklines, TMP 2, STP 3 GTS's Modification 1999-2001  
31 TOTAL INDONESIE Tunu Compression Platform and Offsites TP 7 / EPSC 1 Tunu Field East Kalimantan EPCI Tunu Comprression Platform (TCP) and ASCF, Offsites and CPU 1 &2 Modifications 80X30 M
• 16 Leg CPU Deck
• 16 Leg Piles 48 " Ø
• 4 Leg FWP Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1998-2000
32 Merla Sakti / ARCO ESTA to ESA Pipelines Java Sea EPCI ESTA to ESA Pipelines 1998  
33 Bouygues Offshore Elf Petroleum Satellite West Platform and Central Platform Maharaja Lela Jamalulam Field Brunei EPCi SWP and CP Platform
• 4 legged CP Jacket & Pile
• 4 legged SWP Jacket & Pile
• 1 ea Temporary Drilling Deck
• 1 ea Central Platform Deck
• 1 ea Satellite West Platform Deck
1997-1999
34 ARCO YA JACKET, LNA CONDUCTOR & PILE Java Sea EPC YA JACKET & MODIFICATION
• YA Jacket
• LNA Pile & Conductor
• BJ Jacket Modification
1996-1997  
35 Total Indonesie Tunu Field Development, EPSC 1 - NPU & Associated Offsites and Camp Facilities Rerentang River, Tunu, East Kalimantan EPCI Northern Processing Unit (NPU) 70 X 30 M
• 14 Legs NPU Platform, Weight 3600 Tons
• 4 Legs Fire Water Platform, Weight 450 Tons
• 2 ea HP Flare Tower & 50 M H and Camp
• 1 Ea LP Flare Burn Pit
• Camp and Heliped Facilities
• Fab. & Install (NPU) Including 48" Ø Pile Driving
1996-1998
36 Total Indonesie Tambora Tunu Development Phase IV River Tambora, East Kalimantan EPCi GTS J & Associated Wellhead
• 4 Leg GTS Platform, 1 Unit
• 4 Leg Pre-deven Pile
• Offsite Facilities
1996-1998  
37 Merla Sakti / ARCO LLD, LLE & LLF PLATFORMS Java Sea EPC LLD, LLE, & LLF WELL PLATFORM
• LLD Well Platform
- Jacket (incl. Pile / B/L)
• LLE & LLF Monopod Platform
- Caison & Support
- Deck
- Pressure Vessel
1996  
38 Total Indonesie Handil Enhanced Oil Recovery (EOR) River, East Kalimantan EPCI Gas Compression
• 4 Leg Comp. Deck - 1 Unit
• 4 Leg Piles
1994-1995  
39 Total Indonesie Tambora Tunu Development Phase 3 River, East Kalimantan EPC Welded Plater Girder 1992  
40 MAXUS S.E.S Indri & Kartini "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
1992-1993  
41 Total Indonesie Tambora Tunu Development Phase 2 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 2
• 14 Leg CPU Deck
• 14 Leg Piles
• 4 Leg FWS Deck & Piles
• 45 M Height Flare Stack
• Offsite Facilities (Burn Fit etc.)
1992-1994
42 Total Indonesie Tambora Tunu Development Phase 2 River Tambora, East Kalimantan EPCI GTS B,C,D,E & Associated Wellhead
• 4 Leg GTS Platform, 4 Unit
• 4 Leg Pre-dirven Pile
• Offsite Facilities
1992-1994  
43 ARBNI/Petrosea Pagerungan Gas Development Onshore Pagerungan Island EPC Gas Production facilities modules.
• (13 Modules)
1992-1993  
44 Total Indonesie Tambora Tunu Development Phase 2 River, East Kalimantan EPC Welded Plater Girder 1991-1992  
45 Total Indonesie Tambora Tunu Development Phase 2
Tunu 2/C/210
River, East Kalimantan EPC Welded Plater Girder, Fabrication Steel Element & Deck Plating for GTS & Wellhead Platform 1992-1993  
46 MAXUS S.E.S North Intan "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
• Subsea Cable
1990  
47 Total Indonesie Handil Gaslift River East Kalimantan EPCI Gas Compression (Handil Gaslift & Associated Offsite)
• 4 Leg Module Gaslift Deck
• 4 Leg Piles
• 3 Fender Piles
• Offsite Facilities
1990-1993  
48 MAXUS S.E.S South Zelda "A" Java Sea ECI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side
• 12" Subsea Pipeline
• Subsea Cable
1990  
49 Atlantic Richfield Indonesia BZZA Java Sea EPCI Offshore Oil Production Facilities
• One Topside (deck) facilities
• Subsea Pipeline
• (12" dia, 16" dia, 20" dia)
1989-1990  
50 Total Indonesie Tambora Tunu Development Phase 1 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 1
• 16 Leg CPU Deck
• 16 Leg Piles
• 4 Leg FWS Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1988-1990  
51 Kodeco Oil Ltd. KE-5 Field Development Java Sea EPCI Offshore Gas Production Facilities
• 1 Topside CPP Facility
• 2 Offshore Jacket
• 1 Living Quarter
• 14" dia Pipeline
• ORF at Gresik
1988  
52 Hudbay Oil Kurau Field Development Onshore P. Panjang EPCI Block Station Oil Production & Processing Facilities 1988-1990  
53 Amoseas Indonesia Anoa Field Development Natuna Sea Block D EP Offshore Oil Production Facilities
• One Topside fac
• One Offshore Jacket
• One Living Quarter
• Subsea pipeline.
1988-1990  
54 Atlantic Richfield Indonesia ZULU A/B/C/D/ & AAB Java Sea EPC Offshore Oil Production Facilities
• Five Topside (deck) facilities.
1986-1987  
55 Kodeco Oil Ltd. KE-2 Field Development Java Sea EPCI Offshore Oil Production Facilities
• Four Topside Facilities
• Four Offshore Jacket
• One Sat Proc.
• One Flare Tripod
• Subsea pipeline
1985-1986  
56 Atlantic Richfield Indonesia " M " Field Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Tripod Deck
• 1 Tripod Jacket
• 1 Caisson & Pile
1985-1986  
57 Atlantic Richfield Indonesia "LD" Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Topside Production Facility
• 1 Offshore Jacket
• Pipelines
1984-1985  
58 Atlantic Richfield Indonesia PB, PD, PF Java Sea EPCI Offshore Oil Production Facilities
• Three Topside (Deck) facilities
1983-1984  
59 IIAPCO/MAXUS Cinta Natomas Dev. (Platform 47 & 48) Java Sea EPC Offshore Oil Production Facilities
• 2 Topside (Deck) Prod. Facility
1983-1984