NO. CLIENT PROJECT NAME LOCATION SCOPE OF WORK DESCRIPTION PROJECT DURATION  
1 Swiber / ONGC ONGC - DAMAN DEVELOPMENT PROJECT Adaman Sea Around 60 Km offshore-India Fabrication 3 Jackets & 3 Topsides Fabrication of
- Topsides and Jackets of C24-P3 Platform ,
- Topsides and Jackets of C24-P4 Platform,
- Topsides and Jackets of C24-RP Platform,
- Bridge from C24-RP to C24-P1
2015-2016
2 Petronas Carigali Ketapang II Ltd BTJT-A TOPSIDE MODIFICATION, ADAPTOR FABRICATION AND PILE MAKE-UP FOR BUKIT TUA DEVELOPMENT PROJECT 35 km north of Madura Island and 110 km northeast of Gresik
- Topside Modification
- Fabrication Pile Make Up
- Fabrication Adapter
2014
3 Total Myanmar Seismic Impact Project (SIP) Adaman Sea, 60 Km Offshore nearest landfall Myanmar Engineering, Procurement, Supply, Construction and Commissioning The existing facilities (PP, MCP, WP1, WP2, WP3 and connecting bridges PP-MCP, PP-WP1)
2014
4 Total Myanmar
TEPM - Myanmar
Yadana Subsidence EPSCC1+EPSC2 Adaman Sea, 60 Km Offshore nearest landfall Myanmar EPSCC MSF of Platform
- Topside : 1500 ton
- Jacket : 1500 ton
- Piles : 2600 ton
- Topside : 320 ton
- Jacket 450 ton
2011-2014
5 Total Indonesie Sisi Nubi 2B Peciko 7B Sisi Nubi Field, Mahakam River Delta, East Kalimantan EPCC Platform (topside weight, jacket, piles)
WPS2 (1350,950,2680) four leg
WPN3 (810,800,1800) tripod
SWP-J (810,700,1700) tripod
2012-2014
6 ONGC (INDIA) ICP-R Process Platform and brownfield modification Mumbai High (South) India EPCIC (Gunanusa in joint venture with AFCONS (India)) ICP-R Process Platform
Topside (10,000 ton) consists of

-
MSF - 2900 MT
- Building Module : 1500 MT
- Separator Module : 1900 MT
- Turbine Generator : 1700 MT
- Process Gas Compression : 2000 MT
2009-2011
7 HESS (Indonesia-Pangkah)- Indonesia Central Processing Platform and Accomodation & Utility Platform Solo River Delta, East Java EPCC CPP (total 3712 ton) :
Deck 2008 ton
Compression Module (including Flare Boom) 1705 ton
Jacket 250 ton
Pile 611 ton
AUP :
Deck 1902 ton
Living Quarter 662 ton
Jacket (including Boat landing) 312 ton
Pile 568 ton
Misc
Bridge CPP-WHPA 130 ton, Bridge CPP-AUP 79 ton, Flare Boom 38 ton
Brownfield Modification of WHP-A and WHP-B
2008-2011
8 PTTEP, Thailand Bongkot Field Development Project Phase 4A Gulf of Thailand EPCIC Quarter Platform South, LQ for 160 workers,
Topside 3400 ton
4 legged Jacket 750 ton
Piles 950 ton
Tripod Jacket Flare 650 ton
1000 tons Piles
2008-2011
9 Total Indonesie Peciko Field Development Phase 6 PCK.6 / EPSC.1 Senipah, East Kalimantan EPCI Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 2007-2009
10 Total Indonesie Tunu Field Dev Phase 11. TP.11.S / EPSC.1 - South Compression Platform. EPSC.2 - South Manifold Platform Tunu Field East Kalimantan EPCI TP.11.S / EPSC.1 – South Compression Platform (SCP), Engineering, Procurement, Supply, Construction and Installation of LP Compression Plant. 4600 MT Deck 14 leg Platforms 2006-2009
11 TP.11.S / EPSC.2 –South Manifold Platform (SMP), Engineering, Procurement, Supply and Construction of 2 700 MT Deck, MP manifold with pig launcher and pig receiver, LP Manifold, 2 slug catchers,  
12 Total Indonesie SN 1 / EPSC 1 - PRODUCTION AND SEPARATION PLATFORM SNPS AND OFFSITES Sisinubi - Delta Mahakam River East Kalimantan EPCI Sisi Nubi Production Separation Paltform (SNPS)
70 X 30 M
• 12 Legs 48" Dia of SNPS Platform, Weight 2400 Tons
• Finger Slug Catcher Separator 8 unit, Utilities and Piperack
• Pig Receiver for the incaming 26" Pipelines
• Instrument, Telecomm and Electrical uilding
Associated offsite, tie in, ECB and existing TMP modification
2004-2006
13 Saipem /
BP Berau
BP Tangguh GPF Project PTG. Yard Grenyang C VR-A and VR-B Platform
• 6 legged VR-A Jacket and Deck
• 6 legged VR-B Jacket and Deck
• Pile and Conductors 2,000 Tons
2005-2006
14 Halliburton Conoco FPSO Dev. Project Batam EPC Workshop Building 2002-2003
15 Halliburton Conoco FPSO Dev. Project Batam EPC LER's & PCB Building
• 4 Units LER's (Local Equipment Rooms P4S4, P2S2)
• 1 Unit PCB (Power Control Building)
2002-2003  
16 TOTALFINAELF E&P INDONESIE Peciko Offshore Dev. Phase 4 PCK4/EPSC 2 Kalimantan EPCI Two Satellite Welhead Platforms with Trunklines and Sealines Connected to Existing Platforms
• 2 Jacket 4 Legs SWP E & K 800 Tons/ Ea
• 2 Deck 4 Legs SWP E & K, 1700 Tons/Ea
• 1 Temporary Drilling Deck
• Offshore Hook-up & Modification of 4 Existing Platforms
2002
17 TOTAL INDONESIE Tunu North Field OWT Pltf TNOWT/EPSC 1 Tunu, East Kalimantan EPCI Oily Water Treatment Platform 25 x 29 M
• 4 Legs (OWT) Module Platform
• Offsite Walkways 500 Mtr Long
• Cold Vent Structure & System
• Modification Existing NMP2,NCP,NCR Platforms
2002-2003
18 UNOCAL IND. ATTAKA "O" Platform and Subsea Pipelines Kalimantan EPCI ATTAKA "O" Platform and Subsea Pipelines 2001-2002
19 TOTAL INDONESIE Peciko Field Dev. Phase 3 PCK3/EPSC 1 SWP-G and Sealines Kalimantan EPCI Satellite Wellhead Platform & Pipeline.
• 1 Ea 4 Legs Jacket
• 1 Ea 4 Legs Dexk
• Pipelines 20" Ø - 3600 Mtr
2001-2002
20 TOTAL INDONESIE Tunu North Field Proj. Ph. VIII North Compression Platform Tunu, East Kalimantan EPC North Compression Platform (NCP) 80 x 30 M
• 16 Leg NCP Deck, Weight 5400 Tons
• 16 Leg Piles 3000 tons
• Fab. & Insall (NCP) Including 48" Ø Pile Dreving
2000-2002
21 MAXUS S.E.S Vita's Jacket Java Sea EPC Vita's Jacket, Piles and Miscellaneous Appurtenances 2000  
22 Merla Sakti / ARCO LES ECHO Java Sea EPC LES & ECHO Waterflood 2000  
23 PETROSEA IND. / TOTAL INDONESIE Trunklines, TMP 2, STP GTS A Existing Module & 3 GTS's Modification
TP 7 / EPSC 2
Tunu Field East Kalimantan EPCI Trunklines, TMP 2, STP 3 GTS's Modification 1999-2001  
24 TOTAL INDONESIE Tunu Compression Platform and Offsites TP 7 / EPSC 1 Tunu Field East Kalimantan EPCI Tunu Comprression Platform (TCP) and ASCF, Offsites and CPU 1 &2 Modifications 80X30 M
• 16 Leg CPU Deck
• 16 Leg Piles 48 " Ø
• 4 Leg FWP Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1998-2000
25 Merla Sakti / ARCO ESTA to ESA Pipelines Java Sea EPCI ESTA to ESA Pipelines 1998  
26 Bouygues Offshore Elf Petroleum Satellite West Platform and Central Platform Maharaja Lela Jamalulam Field Brunei EPCi SWP and CP Platform
• 4 legged CP Jacket & Pile
• 4 legged SWP Jacket & Pile
• 1 ea Temporary Drilling Deck
• 1 ea Central Platform Deck
• 1 ea Satellite West Platform Deck
1997-1999
27 ARCO YA JACKET, LNA CONDUCTOR & PILE Java Sea EPC YA JACKET & MODIFICATION
• YA Jacket
• LNA Pile & Conductor
• BJ Jacket Modification
1996-1997  
28 Total Indonesie Tunu Field Development, EPSC 1 - NPU & Associated Offsites and Camp Facilities Rerentang River, Tunu, East Kalimantan EPCI Northern Processing Unit (NPU) 70 X 30 M
• 14 Legs NPU Platform, Weight 3600 Tons
• 4 Legs Fire Water Platform, Weight 450 Tons
• 2 ea HP Flare Tower & 50 M H and Camp
• 1 Ea LP Flare Burn Pit
• Camp and Heliped Facilities
• Fab. & Install (NPU) Including 48" Ø Pile Driving
1996-1998
29 Total Indonesie Tambora Tunu Development Phase IV River Tambora, East Kalimantan EPCi GTS J & Associated Wellhead
• 4 Leg GTS Platform, 1 Unit
• 4 Leg Pre-deven Pile
• Offsite Facilities
1996-1998  
30 Merla Sakti / ARCO LLD, LLE & LLF PLATFORMS Java Sea EPC LLD, LLE, & LLF WELL PLATFORM
• LLD Well Platform
- Jacket (incl. Pile / B/L)
• LLE & LLF Monopod Platform
- Caison & Support
- Deck
- Pressure Vessel
1996  
31 Total Indonesie Handil Enhanced Oil Recovery (EOR) River, East Kalimantan EPCI Gas Compression
• 4 Leg Comp. Deck - 1 Unit
• 4 Leg Piles
1994-1995  
32 Total Indonesie Tambora Tunu Development Phase 3 River, East Kalimantan EPC Welded Plater Girder 1992  
33 MAXUS S.E.S Indri & Kartini "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
1992-1993  
34 Total Indonesie Tambora Tunu Development Phase 2 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 2
• 14 Leg CPU Deck
• 14 Leg Piles
• 4 Leg FWS Deck & Piles
• 45 M Height Flare Stack
• Offsite Facilities (Burn Fit etc.)
1992-1994
35 Total Indonesie Tambora Tunu Development Phase 2 River Tambora, East Kalimantan EPCI GTS B,C,D,E & Associated Wellhead
• 4 Leg GTS Platform, 4 Unit
• 4 Leg Pre-dirven Pile
• Offsite Facilities
1992-1994  
36 ARBNI/Petrosea Pagerungan Gas Development Onshore Pagerungan Island EPC Gas Production facilities modules.
• (13 Modules)
1992-1993  
37 Total Indonesie Tambora Tunu Development Phase 2 River, East Kalimantan EPC Welded Plater Girder 1991-1992  
38 Total Indonesie Tambora Tunu Development Phase 2
Tunu 2/C/210
River, East Kalimantan EPC Welded Plater Girder, Fabrication Steel Element & Deck Plating for GTS & Wellhead Platform 1992-1993  
39 MAXUS S.E.S North Intan "A" Java Sea EPCI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side (Deck)
• 12" Subsea Pipeline
• Subsea Cable
1990  
40 Total Indonesie Handil Gaslift River East Kalimantan EPCI Gas Compression (Handil Gaslift & Associated Offsite)
• 4 Leg Module Gaslift Deck
• 4 Leg Piles
• 3 Fender Piles
• Offsite Facilities
1990-1993  
41 MAXUS S.E.S South Zelda "A" Java Sea ECI Offshore Oil Production Facilities
• 1 Offshore Jacket
• Revamp. one Top side
• 12" Subsea Pipeline
• Subsea Cable
1990  
42 Atlantic Richfield Indonesia BZZA Java Sea EPCI Offshore Oil Production Facilities
• One Topside (deck) facilities
• Subsea Pipeline
• (12" dia, 16" dia, 20" dia)
1989-1990  
43 Total Indonesie Tambora Tunu Development Phase 1 Terentang River Tambora, East Kalimantan EPCI Gas Central Processing Unit (CPU) No. 1
• 16 Leg CPU Deck
• 16 Leg Piles
• 4 Leg FWS Deck & Piles
• 65 M Height Flare Stack
• Offsite Facilities (Burn Pit etc.)
1988-1990  
44 Kodeco Oil Ltd. KE-5 Field Development Java Sea EPCI Offshore Gas Production Facilities
• 1 Topside CPP Facility
• 2 Offshore Jacket
• 1 Living Quarter
• 14" dia Pipeline
• ORF at Gresik
1988  
45 Hudbay Oil Kurau Field Development Onshore P. Panjang EPCI Block Station Oil Production & Processing Facilities 1988-1990  
46 Amoseas Indonesia Anoa Field Development Natuna Sea Block D EP Offshore Oil Production Facilities
• One Topside fac
• One Offshore Jacket
• One Living Quarter
• Subsea pipeline.
1988-1990  
47 Atlantic Richfield Indonesia ZULU A/B/C/D/ & AAB Java Sea EPC Offshore Oil Production Facilities
• Five Topside (deck) facilities.
1986-1987  
48 Kodeco Oil Ltd. KE-2 Field Development Java Sea EPCI Offshore Oil Production Facilities
• Four Topside Facilities
• Four Offshore Jacket
• One Sat Proc.
• One Flare Tripod
• Subsea pipeline
1985-1986  
49 Atlantic Richfield Indonesia " M " Field Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Tripod Deck
• 1 Tripod Jacket
• 1 Caisson & Pile
1985-1986  
50 Atlantic Richfield Indonesia "LD" Development Java Sea EPCI Offshore Oil Production Facilities
• 1 Topside Production Facility
• 1 Offshore Jacket
• Pipelines
1984-1985  
51 Atlantic Richfield Indonesia PB, PD, PF Java Sea EPCI Offshore Oil Production Facilities
• Three Topside (Deck) facilities
1983-1984  
52 IIAPCO/MAXUS Cinta Natomas Dev. (Platform 47 & 48) Java Sea EPC Offshore Oil Production Facilities
• 2 Topside (Deck) Prod. Facility
1983-1984